2022.09.26 14:09
Scheduled maintenance works to be carried out at Klaipėda LNG terminal
Elta EN
PHOTO:
Klaipėda liquefied natural gas (LNG) terminal operations will be stopped from 7 a.m. on 27 September to 7 a.m. 1 October due to pre-scheduled LNG terminal maintenance works, announced KN (Klaipėdos nafta), the operator of the LNG terminal.