The special territorial planning document, which will be accessible to all interested parties, provides for the specific sites for the construction of depots and related facilities. The duration of the publicity procedures is two months. 

Source
It is forbidden to copy the text of this publication without a written permission from ELTA.
Elta EN
Comment Show discussion